Whether the system is designed to feed electricity back into the grid (grid-tied), support on-site loads, or operate as a hybrid with battery storage, it must be reviewed and approved by the utility provider.
We usually measure or convert the watts into amps of solar panels to figure out how much current (amps) is being stored in the battery. Or we measure the amperage of the solar panel output to select the wire sizefrom solar panels to.